Where the network starts
The link between surface and workings begins at the shaft, where the cabling drops underground.
The link between surface and workings begins at the shaft, where the cabling drops underground.
Cable and fibre runs follow the shaft down and branch off at every working level.
Ruggedised network hardware carries the connection along the drives, where ordinary equipment does not last.
Cap lamps are part of the same system, carried by the people working underground.
Everything underground reads on one wall of screens on surface, level by level.
East Rand, Gauteng, South Africa. Call +27 79 753 4616 or email info@hydropro-sa.com.